Accurate Image, Incorporated

Fine Address House Numbers & Letters for Realty      
 
 
Differences Between Cast/Molded & Cut Metals or Plastics for House Number or Letters

 

Install Kit Order

1. What Your Kit Order Includes

Our kit order is designed so that you can make a good decision about size and configuration of the products you wish to purchase. Ordering the wrong size is the most frequent mistake made by our customers. Our kit ordering system is designed to avoid these costly "size" mistakes and to help you with easy installation.

To make sure that you are ordering the correct size for the location where you want to install your address set, we will, within a day after your order (and before we commence production) deliver to you a proof, consisting of a digital, full-scaled, dimensioned drawing showing the letters and/or numbers that you ordered and the layout of these items with our professional kerning.

  1. When your order ships we will include pursuant to such proof , a paper mounting template with your number/letter outlines positioned on it. The outlines each contain the precise location for the mounting studs that will attach to the rear of each number or letter.

  2. Your order will include aluminum mounting studs that are threaded so that the studs will screw into receptacles on the reverse side of each number or letter.

  3. We include a quantity of silicone glue to affix the mounting studs to the installation location.

  4. Finally, we include a step-by-step installation guide.

Click here for a discussion of ordering our numbers or letters as individual pieces and without the installation kit.

2. Suggested Stud Mounting Procedure For Metal or Plastic

For most applications involving small to medium-sized pieces (2" to 15"), our products may be installed with a few common tools and supplies: (a) masking tape, (b) a hand drill (roto-hammer for masonry surfaces), and (c) a level. Sizes larger than 16" may require additional support from the back side of the piece. Following is the suggested procedure for small to medium-sized pieces:

 
Typical Cast Letters's Rear View

 

  • Start your installation by taping the paper template where you wish to place the numbers orHouse Number Template Positioned on Wall for Installation letters.  We recommend that you use a level to insure true horizontal/vertical positioning. Click photo at right for illustration of placed, house number template.

  • Once the template is securely taped, the installer will drill holes into the installation surface using the precise location of the mounting studs as indicated on the template.

  • After the holes are drilled, fill each hole with silicone glue. By hand screw the studs into the holes on the back of the number or letter,  coat each stud with silicone glue, and press studs into the glue-filled holes.

  • The installer, using masking tape, will secure the numbers or letters to the wall surface until the silicon glue hardens.

  • After the glue has set, remove the masking tape and VOILA! you have the industry's finest address identification installed on your premises.
    Polished Aluminum Garamond Italic 2500 Click photo for view of an excellent completed installation of 12" Cut Garamond Italic in Polished Aluminum.

 

3. Plastic Hardware & Suggested Pad Installation Procedure

 

1. PADS ONLY HARDWARE  

Mounting pads are affixed to the inside rear of the letter. The pads are covered with silicone adhesive and pressed against a clean mounting surface. The letter is held in place with masking tape for at least 12 hours.

This mounting hardware is best for indoor locations. WE DO NOT RECOMMEND THIS HARDWARE FOR EXTERIOR LOCATIONS.

 

2. STUDS ONLY HARDWARE         

Aluminum studs thread into a receptacle on the inside rear of your number or letter.  You install as per the diagram below. These numbers or letters may be raised off the wall by using spacers.  We supply such at no extra cost. Specify your desire for spacers in the appropriate section of the order form. The letter is held in place with masking tape for at least 12 hours.

This hardware is great for exterior locations where your pieces are flat against the wall. Also best for small sizes (5" or less).

 

3. STUDS & PADS ALL HARDWARE   

The pads with studs are affixed to all locations inside rear of a letter. The studs are installed per the suggested stud mounting procedure above. The pads are covered with silicone adhesive and pressed against a clean mounting surface. The letter is held in place with masking tape for at least 12 hours. NOTE: This hardware is only available for numbers or letters 6" or greater in height. This hardware is good for exterior locations when your pieces are to stand off the wall.

 

4. STUD-PAD COMBINATION HARDWARE 

The pads with studs are affixed to the upper inside rear of a letter. The lower part of the inside rear of the letter has affixed a pad only.  The installer will drill a 1/4" hole for the studs. The studs are installed per the above diagram. The pads are covered with silicone adhesive and pressed against a clean mounting surface. The letter is held in place with masking tape for at least 12 hours.NOTE: This hardware is only available for numbers or letters 6" or greater in height.

This hardware is good for exterior locations with limited drilling options or where pieces are not exposed to extreme conditions.

The Source

Our foundry is Gemini, Incorporated of Cannon Falls, Minnesota. Gemini manufactures to exacting specifications. We are proud to make these fine products available for you.


Accurate Image, Incorporated
Copyright (c) 2001-2008
All rights are reserved.
  Seattle, Washington
800-618-0444
206-522-1136

Click Here to Contact Us